Description

Installation and Erection works at New Accommodation Camp & Process Plant and other services.

Client(s)

Lycopodium Minerals ( EPCM Contractor) / Torogold (Owner)

Location

Mako, Kedougou, Senegal

Period

January 2017 – February 2018

Scope of works
  • All Plumbing and Electrical installation works at New Accommodation Camp
  • Erection of 1500m of Perimeter Fence at the New Accommodation Camp
  • Welding of all HDPE piping systems- Raw water supply system- Overland piping, Tailings disposal and decant piping, plant site underground piping. More than 20km of HDPE pipes ranging from 60mm to 400mm were welded and installed.
  • Installation of 450m long of Overland Fuel pipeline- from Storage area to Mine Workshop
  • Supply of labour and equipment for the E&I Installation works of the Process Plant
  • Splicing of Fibre Optic Networks at Camp and Process Plant
  • Erection of the Plant High Security Double Fencing and many other fences
  • All Stone pitching works around the plant
  • Concrete and building works – transformer walls, retaining walls and Gold Room
  • Splicing of the 5 conveyor belts with our own equipment
  • Supply and delivery to site of various construction materials, tools and equipment
  • Other services