Description
Installation and Erection works at New Accommodation Camp & Process Plant and other services.
Client(s)
Lycopodium Minerals ( EPCM Contractor) / Torogold (Owner)
Location
Mako, Kedougou, Senegal
Period
January 2017 – February 2018
Scope of works
- All Plumbing and Electrical installation works at New Accommodation Camp
- Erection of 1500m of Perimeter Fence at the New Accommodation Camp
- Welding of all HDPE piping systems- Raw water supply system- Overland piping, Tailings disposal and decant piping, plant site underground piping. More than 20km of HDPE pipes ranging from 60mm to 400mm were welded and installed.
- Installation of 450m long of Overland Fuel pipeline- from Storage area to Mine Workshop
- Supply of labour and equipment for the E&I Installation works of the Process Plant
- Splicing of Fibre Optic Networks at Camp and Process Plant
- Erection of the Plant High Security Double Fencing and many other fences
- All Stone pitching works around the plant
- Concrete and building works – transformer walls, retaining walls and Gold Room
- Splicing of the 5 conveyor belts with our own equipment
- Supply and delivery to site of various construction materials, tools and equipment
- Other services